VERTICAL SHAFT BRICK KLIN TECHNOLOGY
 VSBK - 2
 KANKIA (Orissa)
Energy efficient Environmentally sound Economically viable
 
Technical Operating Information
Brick size : 235 x 112 x 70 mm
Typical soil : Sandy

Green brick production :
Typical clay mix per 1000 bricks
Rice husk : 40 kg
Clay : Balance
Moulding : Manual with steel lined wooden moulds
Weight of green brick : Around 3.18 kg
Drying : Natural air and sun drying
Storage : Open =>Temporary walls with polythene cover
External fuel : 'F' grade coal (Talcher)
                        @ 150 kg per 1000 bricks
Manpower required on klin :
1 Firemaster and 3 firemen per shift+4 women workers for lifting green brick in day shift

Typical energy consumption
0.83-0.85 MJ/kg of fired brick

Energy saving

~30% compared to BTKs
~60% compared to local clamps

Typical environmental performance :
 
Pollutant Workplace environment Stack emissions
SPM 329 µg/m3 77.5 µg/m3 (limit:1000)
SO2 209 µg/m3(limit:5000) 86.5 µg/m3
NOx 37 µg/m3 (limit:6000) 1.33 µg/m3

VSBK - 2 after modification (1998)

Salient Features of the klin

 
Number of shafts : 2
Shaft cross section : 1mx1.75m
Shaft height : 9 batches
Number of chimneys : 2 per shaft
Internal chimneys cross section : 170mmx410mm
Chimney height : 4.5 m above the shaft top
Roof : Mangalore tiles => GI sheet =>Filler slab
Minitor gap : 700mm
Fluegas inlet rows : 2 + 1
Unloading mechanism : Single screw system
Shaft cover : Single part hinged lid
Green bricks lifting : Manually through natural ramp

Rated Output
6500 bricks per day
@ 10 batches unloading during 24 hour operation

Period of Construction
About 40 days during April - May 1997

Cost of Construction
(Including unloading device)
Rs. 2,38,000

 

Project imlementation, Co-ordinating and environmental monitoring: Development Alternatives
Energy Team: Tata Energy Research Institute
Project backstopping: and , Switzerland
Technology consultants: Energy Research Institute, Henan Academy of Sciences PR china

Klin construction and operation Gram Vikas
Mohuda Village, Berhampur
Ganjam, Orissa - 760002
Tel. : (0680) 209755
Modification Done Date
Roof changed from Mangalore tiles to G.I. sheet July 1997
Roof changed from G.I. sheet to filler slab RCC May - June 1998
Dry brick storage arrangement construction May 1998
   
   
   
   

ENERGY EFFICIENCY  AND RENEWABLE ENERGY RESOURCES PROJECT

Sponsored by :  SWISS AGENCY FOR DEVELOPMENT AND CO-OPERATION